Followers

Saturday, July 15, 2017

The Taft General Store dollhouse - Days 11 to 18

Hi everyone!

I forgot to blog! SHAME on me! SHAME!!!!!
I was off my mojo this past weeks but I did a lot too. This post is going to be very picture heavy.

I added Glass tiles to the 3rd floor bathroom in a 'pattern'.



The bedroom was bamboo sticks sanded so the 'veins' would pop-up:



Thin limestone tiles on the second floor. A bamboo stick was added so the dividing wall could be glued in place.






Wallpaper (bege) on the ground floor:







Second floor window trimmings glued in place



Ground floor diving wall:



Made a patterned window with transparent glass tiles:




Changed the front door:



Back window with 'glass' in place:


Made a sky light window for the little room in the back:


View from nside:


In the little room I made the floor with, again, glass tiles



Now I'm cutting thick limestone tiles to cover the exterior facade(is that the right word?)
I already cut myself twice....
But it will be worth it!
Later!

No comments:

Post a Comment